Grant Round 29

Medium
h2
Left
Grant Round 29

Summary of Applications

Technical Review Summary

Approval Summary

ND Petroleum Council's Oil Can! Program

G-29-B Application

 

Bakken Production Optimization Program

G-29-C Application

 

G-29-59: ND Petroleum Council's Oil Can! Program  

  • Sponsor: ND Petroleum Council
  • Objective: To provide advertising, branding and promotion, media & policymaker education & outreach, and website & social media to promote the growth of the oil and gas industry. 
  • Funded Amount: $630,910
  • Total Project Cost: $1,560,420
    • Final Report 

Grant Round 28

Medium
h2
Left
Grant Round 28

Summary of Applications

Technical Review Summary

Approval Summary

Public-Private Partnership to Support Geology and Geological Engineering Education and Research at UND's College of Engineering and Mines

G-28-A Application 

 

G-28-58: Public-Private Partnership to Support Geology and Geological Engineering Education and Research at UND's College of Engineering and Mines  

  • Sponsor: University of ND (UND)
  • Objective: To establish the Harold Hamm School of Geology and Geological Engineering as component of the College of Engineering and Mines at the University of North Dakota. 
  • Funded Amount: $3,791,800
  • Total Project Cost: $14,000,000
    • Final Report 

Grant Round 27

Medium
h2
Left
Grant Round 27

Summary of Applications

Technical Review Summary

Approval Summary

Distributed Ammonia Production from Associated Gas

G-27-I Application

 

No Approved Projects

Grant Round 26

Medium
h2
Left
Grant Round 26

Summary of Applications

Technical Review Summary

Approval Summary

CO2 Enhanced Bakken Recovery Research Program

G-26-F Application

 

G-26-56: CO2-Enhanced Bakken Research Program  

  • Sponsor: Energy & Environmental Research Center (EERC)
  • Objective: Evaluate the use of CO2 to increase the ultimate recovery of Bakken oil by using new and existing reservoir characterization and laboratory data integrated with reservoir modeling to determine the viability of CO2 for enhanced oil recovery (EOR) in the Bakken Formation.  
  • Funded Amount: $475,000
  • Total Project Cost: $1,375,000
    • Final Report 

Grant Round 25

Medium
h2
Left
Grant Round 25

Summary of Applications

Technical Review Summary

Approval Summary

Investigation of Methodologies to Control Dust on County Roads in Western ND

G-25-A Application

 

Effects of Oil and Gas Development on Mule Deer Populations in Western ND

G-25-B Application

 

G-25-54: Investigation of Methodologies to Control Dust on County Roads in Western ND  

  • Sponsor: Dunn and McKenzie County
  • Objective: Evaluate and compare several different products and construction techniques that will be used in road test strips of one-half to one mile in length to identify and evaluate cost effective methods to control dust on unpaved roads in western North Dakota. 
  • Funded Amount: $220,000
  • Total Project Cost: $440,000
    • Final Report 

G-25-55: Effects of Oil and Gas Development on Mule Deer Populations in Western ND

  • Sponsor: ND Game and Fish Department 
  • Objective: Investigate and quantify effects of oil and gas development to mule deer populations through study of survival, movements, resource selection, abundance, and recruitment. 
  • Funded Amount: $329,374
  • Total Project Cost: $658,747
    • Final Report 

Grant Round 24

Medium
h2
Left
Grant Round 24

Summary of Applications

Technical Review Summary

Approval Summary

Demonstration of Gas-Powered Drilling Operations for Economically Challenged Wellhead Gas and Evaluation of Complementary Platforms

G-24-A Application

 

Progress Zone Campaign Under the Umbrella of the Oil Can

G-24-B Application

 

Improved Directional Drilling Technology for the Bakken Formation

G-24-C Application

 

G-24-52: Demonstration of Gas-Powered Drilling Operations for Economically Challenged Wellhead Gas and Evaluation of Fomplementry Platforms  

  • Sponsor: Energy & Environmental Research Center (EERC)
  • Objective: Explore, identify, and demonstrate technologies for utilizing wellhead gas by demonstrating collection, transportation, and fueling of a diesel engine power system for a drilling operation using pipeline or "lean" gas and demonstrate the powering of a drilling operation utilizing delivery of compressed BakkenFormation associated gas.
  • Funded Amount: $750,000
  • Total Project Cost: $1,900,000
    • Final Report 

G-24-53: Improved Directional Drilling Technology for the Bakken Formation

  • Sponsor: Laserlith Corporation
  • Objective: Increase the efficiencies of horizontal drilling through a redesign of horizontal drilling tools. 
  • Funded Amount: $200,000
  • Total Project Cost: $1,039,346
    • Final Report 

Grant Round 23

Medium
h2
Left
Grant Round 23

Summary of Applications

Technical Review Summary

Approval Summary

Investigation of Improved Conductivity and Proppant Applications in the Bakken

G-23-A Application

 

G-23-51: Investigation of Improved Conductivity and Proppant Applications in the Bakken  

  • Sponsor: Energy & Environmental Research Center (EERC)
  • Objective: Improve the lateral and vertical drainage of hydrocarbons from the Three Forks and Bakken Formations by identifying the factors that lead to the collapse of propped fractures. Laboratory testing is proposed to determine whether more durable fracture conductivity can be achieved in the Bakken by altering the fracturing fluids, proppant types, and proppant concentrations.
  • Funded Amount: $150,000
  • Total Project Cost: $332,432
    • Final Report 

Grant Round 22

Medium
h2
Left
Grant Round 22

Summary of Applications

Technical Review Summary

Approval Summary

Hydraulic Fracturing Regulatory E-Reference

G-22-C Application

 

ND Petroleum Council Oil Can Program

G-22-D Application

 

Wellhead Gas Capture via CNG Technologies

G-22-E Application

 

G-22-48: Wellhead Gas Capture Via CNG Technologies  

  • Sponsor: Bakken Express, LLC
  • Objective: Evaluate compressed natural gas (CNG) technologies as an economic method to capture and transport produced natural gas and gas liquids to market.
  • Funded Amount: $873,300
  • Total Project Cost: $2,108,200
    • Final Report 

G-22-49: ND Petroleum Council's Oil Can! Program

  • Sponsor: ND Petroleum Council 
  • Objective: Through this project the North Dakota Petroleum Council will continue their efforts through education and outreach to industry members, landowners, royalty owners, policymakers, and the general public. 
  • Funded Amount: $205,000
  • Total Project Cost: $577,834
    • Final Report 

G-22-50: Hydraulic Fracturing Regulatory E-Reference  

  • Sponsor: Interstate Oil & Gas Compact Commission (IOGCC) 
  • Objective: The Interstate Oil and Gas Compact Commission (IOGCC) will develop an interactive web-based reference tool that will list existing state regulations that apply to the process of hydraulic fracturing by state and topic.   The primary objectives include:
    • To provide easy access to individual states’ regulations relating to hydraulic fracturing;

    • To provide information in an easy-to-access format for comparison to other states and improvement of individual state programs;

    • To demonstrate that member states have effective regulatory systems and processes that prevent damage to resources, the environment, and public health and safety from hydraulic fracturing.     

  • Funded Amount: $125,000
  • Total Project Cost: $599,771
    • Final Report 

Grant Round 21

Medium
h2
Left
Grant Round 21

Summary of Applications

Technical Review Summary

Approval Summary

WRAP Phase III Oil and Gas Air Emissions Inventory for the Williston Basin

G-21-A Application

 

Simul-Frac two Bakken Wells Spaced 1320' Apart to Maximize OOIP Recoveries

G-21-B Application

 

Flare to Electricity-Recycled Energy from a Wasted Resource

G-21-D Application

 

G-21-46: WRAP Phase III Oil and Gas Air Emissions  

  • Sponsor: Western Energy Alliance
  • Objective: To provide credible, scientific data on emissions from comprehensive sources associated with the exploration and production of oil and natural gas.
  • Funded Amount: $25,000
  • Total Project Cost: $95,000
    • Final Report 

Grant Round 20

Medium
h2
Left
Grant Round 20

Summary of Applications

Technical Review Summary

Approval Summary

Flare Gas-Power Generation Viability Pilot

G-20-A Application

 

Enhanced Oil Recovery from the Bakken Shale Using Surfacant Imbibition Coupled with Gravity Drainage

G-20-B Application

 

Commercial Drivers License Training Program

G-20-C Application

 

G-20-43: Flare Gas-Power Generation Viability Pilot  

  • Sponsor: Blaise Energy, Inc.
  • Objective: To demonstrate the commercial viability of using otherwise wasted associated gas as fuel for onsite electrical power generation and its subsequent sale to the grid of the electricity as an alternative to flaring.
  • Funded Amount: $375,000
  • Total Project Cost: $7,474,000
    • Final Report 

G-20-44: Enhanced Oil Recovery from the Bakken Shale Using Surfactant Imbibition Coupled with Gravity Drainage

  • Sponsor: University of ND (UND) 
  • Objective: This three-year research project consisting of laboratory experiments and field applications is aimed to provide enhanced oil recovery in the Bakken shale.
  • Funded Amount: $125,000
  • Total Project Cost: $819,763
    • Final Report 

G-20-45: Commercial Drivers License Training Program  

  • Sponsor: Train ND-Northwest, Williston State College 
  • Objective: To purchase two simulators (Doron 550 Truck Simulator and the Air Brake Simulator) and a trailer for the simulators to allow the training to be delivered at various locations. TrainND has previously provided the CDL training in partnership with the Center for Transportation Safety based in Colorado, but this partnership is no longer available to TrainND.
  • Funded Amount: $50,000
  • Total Project Cost: $373,980
    • Final Report